Installation and Operation Instructions
m
WARNING
6�5 Connection of the supply line / Start-up
m
WARNING
m
WARNING
MiniVent M1/100/120
m The safety instructions in chapter 1�3 must be observed!
– The electrical connection and initial start-up are to be carried out in accordance with the relevant
wiring diagram and are only to be carried out by a certified electrician.
– All relevant standards, safety regulations (e.g. DIN VDE 0100), as well as the technical connection
conditions of energy suppliers are to be adhered to!
– A multipole mains section switch/isolator, with a minimum contact opening of 3 mm (VDE 0700 T1
7.12.2 / EN 60335-1) is mandatory!
– Network configuration, voltage and frequency must be consistent with the rating plate information.
– A commercially available NYM line must be used, maximum diameter 11 mm
– Pre-pierce grommet with round tool or pierce directly with supply line (Fig.9, Pos ô)
– Remove sheath to100 mm. Strip wires to 10 mm (Fig.12)
– Carefully push cable through the grommet
– Place wires in the cable channel and connect according to wiring diagram (chap. 7.2 on page 11)
– Check the waterproofing of the connection cable and tight clamping of the strands
– If the grommet does not evenly enclose the sheathed cable once the supply line is installed, the
grommet must be additionally sealed, e.g. with Silicone N. Otherwise, the IP protection will expire
– The connection cable and the control line must be stored so that no water can get in along the cable
in case of water exposure. The cables must not be placed over sharp edges!
– Check designated use of fan
– Compare mains voltage to rating plate data
– Check fan for solid mounting and professional electrical installation
– Check freewheeling of the impeller
– Check all parts for tightness, particularly screws, protection guards.
Do not loosen screws in the process!
– Check fan for vibration and noise during test run
9