Plunge Base (PR011) and
Accessories
Installing the Palm Router to the
Plunge Base
(Fig. 17)
1. Open the Clamping Lever 16
2. Align the double arrow on the Palm
Router 1 to the double arrow on the
Plunge Base 34 then insert the Palm
Router 1 into the Plunge Base 34
3. Slightly rotate the Palm Router 1 clock-
wise until the base aligns with the slot.
4. Slide the Palm Router 1 into the base
as far as it will go, then rotate the Palm
Router 1 clock-wise until it locks into
the base
.
5. Close the Clamping Lever 16
Note: The tightness of the clamping lever
can be adjusted as needed, see "Adjusting
the Clamping Lever" on page 25.
Fig. 17
1
34
Removing the Palm Router from
the Plunge Base
1. Reverse steps 1-5 from the section
"Installing the Palm Router to the Fixed
Base" on page 15.
20
Assembly
.
.
16
Installing Plunge Base Groove
Routing Dust Extraction Hood
(PR012) (optional accessory)
(Fig. 18)
1. Insert the Plunge Base Groove Routing
Dust Extraction Hood 49 into the open-
ing of the Plunge Base 34 and on top
of the Subbase
hood can be installed with the hose out-
let facing the front or rear of the base.
2. Align the holes on the hood to the holes
.
in the Subbase 21 and secure it in place
with the Dust Extraction Thumb Screws
53
.
3. Connect the hood to the vacuum using a
friction fit nozzle.
Fig. 18
53
49
Installing Plunge Base Edge-
Forming Dust Extraction (RA1175)
(optional accessory)
(Fig. 19, Fig. 20)
The edge-forming hood can be attached in
several positions on the subbase according
to edge forming operation needs or prefer-
ences.
1. Position the Plunge Base Edge Forming
Dust Extraction Hood 48 underneath the
Subbase 21 of the Plunge Base 34 and,
depending on the desired placement,
align the subbase auxiliary holes with
the holes or slots on the dust extraction
hood.
2. Secure it in place with the Dust Extrac-
tion Thumb Screws 53.
3. Connect the hood to the vacuum using a
friction fit nozzle.
; the dust extraction
34
53