Télécharger Imprimer la page

Jacobsen RYAN Mataway Overseeder Manuel D'utilisation, D'entretien Et D'installation page 24

Publicité

SERVICE
TRANSMISSION GEAR REPLACEMENT
1. Remove the transmission from the unit.
2. Remove the sprocket, pulley and keys.
3. Remove the plug and drain the oil from the gear
case.
4. Remove the the remaining hardware. Take note
of which side is the input side and which is the
output side so that they can be reassembled
correctly. Using a soft hammer, tap case on the
tabs to break the seal, and pull halves E & F
apart.
5. Remove the input shaft A, output shaft B and
spacer C. Also remove the bearings D and
grease seals.
6. Install new bearings into both case halves.
DO NOT install new grease seals at this time.
INPUT SHAFT
7. Remove large double gear E, small gear F, key
G, and spacer H from input shaft J.
8. Check the input shaft for wear and replace if
necessary (if shaft needs to be replaced, install
the existing snap ring K on new shaft). If the
shaft is NOT replaced, remove any burrs from
keyways and/or shaft ends if necessary.
9. Replace bushings in the large double gear E (or
replace gear if necessary). When replacing
bushings, make sure they are flush with the edge
of the gear and that the oil holes on gear are
aligned.
10. Install the spacer H onto shaft against the snap
ring K. Install the large double gear E, with the
small gear side against the spacer.
11. Install key G into keyway and slide the small gear
F (flat side toward the larger gear) onto the shaft.
GB-22
MATAWAY
OVERSEEDER

Publicité

loading

Produits Connexes pour Jacobsen RYAN Mataway Overseeder

Ce manuel est également adapté pour:

544873b