Télécharger Imprimer la page

Maytag Commercial MLE22PRAYW Instructions D'installation page 24

Publicité

3. Connect remaining wires under outer terminal block
screws (F). Tighten screws.
4. Connect a separate copper ground wire (G) under the green
external ground conductor screw (C) to an adequate ground.
Finally, reinstall terminal block to dryer rear panel. Secure
cover with hold-down screw. Now go to "Venting
Requirements."
C
G
LEVELING
Leveling Stacked Washer/Dryer
Leveling your washer/dryer properly reduces excess noise and
vibration.
1. Remove cardboard from beneath washer/dryer. Place a level
on top edges of washer/dryer, checking each side and front.
If not level, tip washer/dryer and adjust feet up or down as
shown in Steps 3 and 4, repeating as necessary.
24
2. Grip washer/dryer from top and rock back and forth, making
sure all four feet are firmly on floor. Repeat, rocking
washer/dryer from side to side. If washer/dryer rocks, go to
Step 3 and adjust leveling feet. If all four feet are in firm
contact with floor, go to Step 4.
F
F
3. If washer/dryer is not level, use a 9/16" or 14 mm openend
or adjustable wrench to turn jam nuts clockwise (as viewed
from above) on feet until they are about 1/2" (13 mm)
from the washer/dryer cabinet. Then turn the leveling foot
counterclockwise to lower the washer/dryer or clockwise
to raise the washer/dryer. Recheck levelness of washer/
dryer and that all four feet are firmly in contact with the floor.
Repeat as needed.
HELPFUL TIP: You may want to prop up front of washer/dryer
about 4" (102 mm) with a wood block or similar object that will
support weight of washer/dryer.
4. When washer/dryer is level and all four feet are firmly in
contact with the floor, use a 9/16" or 14 mm open-end or
adjustable wrench to turn jam nuts counterclockwise (as
viewed from above) on leveling feet tightly against washer/
dryer cabinet.
HELPFUL TIP: You may want to prop washer/dryer with wooden
block.
COMPLETE INSTALLATION
1. Check the electrical requirements. Be sure that you have the
correct electrical supply and the recommended grounding
method. See the "Electrical Requirements" section.
2. Check that all parts are now installed. If there is an extra part,
go back through the steps.
3. Check that you have all of your tools.
4. Dispose of/recycle all packaging materials.
5. Check that the water faucets are on.
6. Check for leaks around faucets and inlet hoses.
A
A. Jam Nut

Publicité

loading