Télécharger Imprimer la page

Wessamat TopLine W 121 L Mode D'emploi page 66

Publicité

Les langues disponibles

Les langues disponibles

User manual
6.4 Setting of the ice cube height
Switch off the machine at the production switch (Position "Produktion aus/off") and pull the
1.
power plug. Remove the machine cover and the cover of the technical equipment box (marked
with a flash symbol).
2.
Release the fixing screw of the water level sensor.
3.
Change the position of the water level
sensor
Move upwards → longer ice cubes
Move downwards → shorter ice cubes
4.
Tighten the screw, insert the power
plug and switch on the machine (Position
"Produktion
ein/on")
production cycle.
5.
Switch off the machine (Position
"Produktion aus/off") and pull the power
plug once the required ice cube height is
reached. Replace the electrics box and
housing cover and tighten the screws.
Re-start the machine.
IMPORTANT:
At the maximum setting of the water level sensor, ensure that no water spills over the
edge of the trough during the production cycle (during trough movement).
User-manual-TopLine-v.02
and
monitor
a
Deutsch 4-43 – English 44-79 – Français 80-114
Water level sensor
Abb. 6.4: Setting of the ice cube height
Tub
01/2021
66

Publicité

loading