ProMinent DULCOTEST ICT 2 Mode D'emploi page 37

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Tube installation with joint
ProMinent
®
IMPORTANT
• If you later require measurement accuracy better than 10 %,
fit a tap near the sensor to take water samples (see section 8
under "Calibration").
The sensor ICT 2 can be directly installed in tanks and pipes or via a
flange and/or an in-line probe housing (see optional accessories in
section 15).
Before installing the sensor, carry out commissioning up to and
including zero point calibration (see section 8).
Insert the sensor into the opening of the media tubing or the tank
(the flat seal must sit on the inside of the tubing or tank). If used in
flowing media, the sensor tip bore must be placed in the centre of
the tube cross section.
Rotate the sensor so that the bore of the sensor tip is facing in
the direction of the flow (arrow).
Tighten the union nut.
Fig. 5
Assembly
a = Distance from wall
a
37

Publicité

Table des Matières
loading

Table des Matières