SMART DLM
1 Information on this manual
This manual aims to describe the characteristics and use of the SMART DLM system, as well as its
connection and configuration for start-up.
1.1 Scope, nomenclature and icons
This document will generically refer to the units for charging electric vehicles with the term "Charging
point" or "CP", to the SMART DLM 2.0 as "SMART DLM" and to the installation as "system" or "plant".
The following icons will also be used to identify the various devices present in an installation.
Power Grid
1.2 Target audience
The connection of the installation is directed at qualified personnel. Qualified personnel, as referred to
in this manual, means personnel who at least meet the requirements of all safety standards, rules,
regulations, and legislation applicable to the equipment installation and operating tasks for all the
elements in the installation.
The responsibility for appointing qualified personnel shall always fall to the company employing the
said personnel. This company must decide which worker is suitable for each specific task, in order to
maintain worker safety and comply with all occupational safety legislation.
The said companies are responsible for providing their personnel with adequate training in work with
electrical equipment and for ensuring that such personnel is familiar with the contents of this manual.
1.3 Symbols
Different symbols will be used throughout this manual, to emphasise and highlight certain texts. The general
meaning of these symbols is explained below.
This indicates a hazard to personnel or the device.
Indicates importance.
Additional information or references to other parts of the document or
documents.
ABW2012IQM01_E.docx
Wattmeter
Ingeteam
Charging Point
EN
ES
FR
IT
5