Ingeteam
4.2.2
EM24 A65+
All connections must be made with the power disconnected.
The protective covers protect against direct electrical contact. They should be removed in order to
make the connections and replaced once the connections have been made.
Make the connection as shown in the following figure, installing current transformers in each phase.
Consult the section on "Current Transformers" for further information on these transformers
The wattmeter must be installed upstream from the installation that consumes and generates
the power to be managed.
14
SMART DLM
ABW2012IQM01_E.docx