EM24 A65
All connections must be made with the power disconnected.
The protective covers protect against direct electrical contact. They should be removed in order to
make the connections and replaced once the connections have been made.
Make the connections as shown in the following figures.
Single phase installation *
* A bridge should be made between points 1 and 4 of the
wattmeter.
The wattmeter must be installed upstream from the installation that consumes and generates
the power to be managed.