Ingeteam
The wattmeter must be installed upstream from the installation that consumes and generates
the power to be managed.
End-of-line resistor and RS485 bus.
Connection points 7 and 8 should be connected to enable the 120Ω end-of-line resistor.
The RS-485 communication should be made as indicated in the following table:
10
Single-phase installation
Pin
8
9
10
Three-phase installation
Signal
RS-485 B (+)
RS-485 A (-)
GND
SMART DLM
ABW2012IQM01_E.docx