Ingeteam
4.3 Configuring the wattmeter
4.3.1
EM540/EM530
Configuration of the wattmeter for the correct operation of the SMART DLM.
1. Supply power to the Wattmeter from the electrical grid.
2. Access the configuration menu by pressing the right side
ENTER button. Scroll to SETTINGS with the UP /
DOWN buttons and press the right ENTER button again.
3. Scroll to SYSTEM with the UP / DOWN buttons and
press the right ENTER button again. Scroll UP / DOWN
until you come to 3PN (for three-phase installations) and
press the right ENTER button again to accept.
4.
For the EM530 scroll to CT RAT with the UP / DOWN
buttons and press the right ENTER button again. As an
example, if the transformer primary current is 3000 A
and the secondary current is 5 A, the transformer ratio is
600. Press the right ENTER button to accept.
18
SMART DLM
UP
DOWN
ENTER
ABW2012IQM01_E.docx