12
ASSEMBLY
12.1
Preparatory activities
12.1.1
Delivery content
Please check the product contents (see capture
11.1) immediately after receipt for any eventual
transport damage or missing parts. Claims from
transport damage or missing parts must be
placed immediately after initial machine receipt
and unpacking before putting the machine into
operation. Please understand that later claims
cannot be accepted anymore.
12.1.2
Workplace requirements
The workplace has to fulfill the requirements
stated in capture 12.
The ground has to be even, in level and hard. It must be suitable at least to weight it with double
weight per square meter than the machines net weight.
The chosen workplace must have access to a suitable electric supply net hat complies with the
machines requirements.
12.1.3
Transport
The machine can be transported in package with a forklift.
The machine is very heavy. The machine shall be lifted from crate with a suitable lifting device
only that is certified to be able to carry the machines load.
The lifting and transportation of the machine must only be carried out
by qualified staff and must be carried out with appropriate equipment.
Note that lifting equipment used (crane, forklift, sling, etc.) must be in perfect condition.
To maneuver the machine in the packaging can also a pallet jack or a forklift be used.
12.1.4
Preperation of the surface
Uncoated metal machine parts have been insulated with a greasy layer to inhibit corrosion.
This layer has to be removed. You can use standard solvents that do not damage the machine
surface.
Do not use solvents based on nitrite, aggressive solvents like break cleaners or
scrubbing agents!
These damage the machine surface.