Abicor Binzel ABIDRIVE V2 Mode D'emploi page 52

Dévidoir de fil froid tig
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6 Putting into operation
6.6 Connecting the shielding gas
 Fig. 20 Overview of connections and control elements on page EN-24
NOTICE
• The valve of the shielding gas cylinder must be closed when the gas hose is installed.
• To ensure a tight connection between the shielding gas hose and the connector, the nut must be tightened completely
using a spanner.
1 Connect the shielding gas hose to the gas connector (13).
2 Connect the shielding gas hose to the shielding gas cylinder.
6.7 Connecting the torch cable assembly
NOTICE
• Only use intermediate cable assemblies and torch cable assemblies designed for the ABIDRIVE V2.
• Applies to liquid-cooled welding torches only.
• Please also consult the operating instructions for the welding components, such as welding torch and power source.
• Ensure that the coolant supply and return hoses have been correctly installed.
Coolant supply = blue, coolant return = red.
• Do not use deionised or demineralised water as coolant or for leak and flow tests. This may shorten your welding
torch's service life.
• Only use special welding coolant.
• We recommend using ABICOR BINZEL BTC coolant.
• The use of unsuitable coolants may damage the system and void the warranty.
1
6
1
ABIDRIVE V2
2
Welding torch with cable assembly
Fig. 15
Connecting the coolant
1 Connect the coolant supply (5) and coolant return (6) to the ABIDRIVE (1).
2 Insert the control lead connector (4) into the ABIDRIVE connection bush (1) and secure it by turning the nut clockwise.
3 Insert the central connector (3) into the ABIDRIVE connection bush (1).
EN - 20
5
4
3
Central connector
5
Cable assembly coolant supply
4
Control lead connector
6
Cable assembly coolant return
TIG cold-wire feeder
2
3
BAL.0415.0 • 2018-10-22

Publicité

Table des Matières
loading

Table des Matières