Fig. 5 Side View of Cooktop
26-3/8"
3" TO CENTERLINE GAS INLET
22-5/8"
23-3/8"
2"
Cabinet face for installation with projecting control panel
Cabinet face for installation with flush control panel
* Low Back required when there is less than
12" horizontal clearance from back of cooktop to
combustible material. With more than 12" of
clearance, the Island Trim may be used.
Fig. 8 Installation of 48" Cooktop above two
side-by-side Thermador Warming Drawers,
Model No. WD24
inim m 3/ " (19 mm)
(22, 9 cm) 9"
2-3/ " (7 cm) Ver ical is ance
Be ween
s
(See Side View f r
All manuals and user guides at all-guides.com
Step 2: Cabinet Preparation
Fig. 6 Projecting from
12"
1/2"
Side Flange
7-3/4"
3"
3/4"
Front projects outward 1-3/8"
as shown from standard 24"-
deep base.
0"
2"
(0 - 51mm)
See Fig.
and Table
imensi n
1-7/8" ( ,8 cm)
H riz n al is ance Be ween
d S pp r )
Cabinet Front
5/8"
Notch
Depth
1-3/8"
Side View
Plywood support
Install additional
wood support along
front edge of cutout
s
6
Fig. 7 Flush to Cabinet
Front
* Provide clearance for screws by in-
creasing cutout height by 1/16" or by
notching in the location of the three
screws.
2" Notch
Depth
Front flush with cabinets;
minimum
of 25-3/8" cabinet depth
required.
7
-13
/
"
16
(19,8 cm)
2 3/4" (70 mm) minimum
between cutouts