A
Open HARDWARE FOR STEP 1. Remove STYROFOAM
1
BLOCK (1) from carton and rest MAIN FRAME
(3) on STYROFOAM BLOCK (1) as shown.
B Attach FRONT STABILIZER (2) to MAIN FRAME (3) using 4
BOLTS (A), 4 SPRING WASHERS (B). and 4 FLAT WASHERS (C).
C
Attach FOOTPAD ASSEMBLY (4) to SEAT RAIL (5) using 4 BOLTS
(D), 4 SPRING WASHERS (B) and 4 FLAT WASHERS (C).
D Attach REAR STABILIZER (6) to SEAT RAIL (4) using 4 BOLTS
(D), 4 SPRING WASHERS (B) and 4 FLAT WASHERS (C).
Hardware For Step 1
Description
A
Bolt (25 mm)
B
Spring Washer
C
Flat Washer
D
Bolt (15 mm)
110
Qty
4
12
12
8
A
Open HARDWARE FOR STEP 2.
2
B Oxford 6 only: Connect the SEAT RAIL WIRES (7).
C
Slide SEAT RAIL (5) into the MAIN FRAME (3) as shown.
D Attach SEAT RAIL (5) to MAIN FRAME (3) using 4 BOLTS
(E), 4 SPRING WASHERS (B) and 4 FLAT WASHERS (C).
E
Snap MAIN FRAME COVER (8) into place.
F
Slide seat and SEAT FRAME ASSEMBLY (9) onto SEAT RAIL (5).
G Remove and discard STYROFOAM BLOCK (1).
Hardware For Step 2
Description
Qty
E
Bolt (85 mm)
4
B
Spring Washer
4
C
Flat Washer
4
Tighten all 6 bolts