Components' Assembly - OEM HENERGO HV/45 E-1 Mode D'emploi Et D'entretien

Four pour pizza
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

G45
Installation and connections
Chapter 3
All operations described in this chapter shall be
carried out by skilled and authorized technicians,
only.
3.1 -
LIFTING OF THE MACHINE (Fig. 1)
The machine should be lifted by means of a crane or
hoist, as follows:
The oven shall slightly alternatively be lifted from its
four sides using a lever and making sure the panels
are not damaged, then the oven shall be positioned
on shims (1).
Insert two belts, (2) suitably dimensioned to the
weight of the machine, under the base (3) of the
machine and connect them to the hook (4) of a crane
or hoist.
ATTENTION
To hoist the machine do not use steel belts as they
may damage the outside body.

3.2 - COMPONENTS' ASSEMBLY

For the supporting element's assembly, please fol-
low the indications in the relevant manuals.
Position the supporting element (1) in the oven's
fi nal installation area and breaking castors (optional)
on control side. Apply the brakes on front castors
pressing the lever (2) or level the oven acting on
adjustable feet (3) according to the kind of supporting
element.
Assembly of single-chamber oven (Fig. 2)
Raise the oven (4) as indicated in "raising" paragraph
and put it on the top of the base, paying attention as
to have the fi xing brackets given in the equipment
(5) corresponding to the holes on the lower part of
the oven.
Fix the oven (4) to the supporting element (1) by
the screws (6) and the washers given in the equip-
ment.
DANGER
IMPORTANT
FIG. 1
2
1
3
FIG. 2
6
5
4
2
1
1
4
1
2
3
EN - 11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Henergo g45/1Henergo g45/2Henergo g45/3

Table des Matières