PAIRED CONNECTION
Important! Start by performing the following procedures on both operators:
- fi t the RSE card (with the DIP-switches set to OFF) on the connector of both operator's cards.
- connect the two circuit cards with a CAT 5-type cable (max. 1,000 m) onto terminals A-A / B-B / GND-GND.
- connect all of the control and safety devices on the MASTER operator's control panel.
Important! All functions settings must be done on the MASTER control panel.
Confi guring the MASTER operator
Select function F 49. Press ENTER to confi rm.
Select 1 (paired) and press ENTER.
Perform settings and adjustments on the control board.
Transferring parameters from MASTER to SLAVE
Select function F 52 on the MASTER control panel.
Select 1 and press ENTER.
Programming
On both operators, set the following functions:
- the type of motor (A1);
- the opening direction (F54);
- total stop (F1);
- travel calibration (A3).
Proceed with the settings and adjustments on the MASTER control board.
Operating modes
Either STEP-STEP or ONLY OPEN command. Both leaves open.
PARTIAL/PEDESTRIAN OPENING command. Only the MASTER operator's leaf opens.
For the types of command that can be selected and paired to users, see the ENTERING USERS WITH ASSOCIATED
COMMANDS.
MASTER
MASTER
SLAVE
SLAVE