Section 2 : Track Kit Installation; Front Tracks Installation; Figure 6 - Front And Rear Left Pre-Assembled Track Kit; Figure 7 - Front Track Kit Installation (Step 3.1) - Polaris PROSPECTOR PRO SR Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

RANGER PROSPECTOR PRO SR TRACK KIT
KIT PN 2878074

SECTION 2 : TRACK KIT INSTALLATION

WARNING
Prior to installation of the Track Kit, turn off the
engine, put in two-wheel driving mode, and block
the rear wheels.
WARNING
When the UTV is raised, make sure that it is
properly secured/supported to prevent it from
accidentally falling during the installation of the
tracks. If not properly secured/supported, serious
physical injury could occur.
2.1. Front Track Installation
1. Install front subtable per the instructions included
with the mounting kit.
Front left shown
Bowed shape on
the ground

Figure 6 - Front and rear left pre-assembled Track Kit

2510309
A-2510309-1
Do not inverse the right and left side.
Do not inverse the front and rear kits.
2. Install the front pre-assembled Track Kit on the
UTV hub, in the same place where the wheel had
been installed and use the supplied flange nuts
included with the mount kit. Apply a tightening
torque of 35 ft-lbs.
NOTE : Retorque after one hour of use.
3. Assemble the front anti-rotation assembly on the
Track Kit following these steps (see Figure 7) :
3.1. Install the anti-rotation assembly (A) onto the
The washer and the spacer are very important; they
prevent the nut from coming loose.
Rear left shown
Flat shape on
the ground

Figure 7 - Front Track Kit installation (step 3.1)

- 12 -
WARNING
pre-assembled Track Kit using the bolt (B),
the 3/8" dia flat washer (C), the tightening
spacer (D), and the nylock nut (E) supplied
with the mount kit. Torque to 25 ft-lbs.
WARNING

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

2878074

Table des Matières