Rocal HEBAR E3000 Manuel Des Caracteristiques, Installation Et Fonctionnement page 10

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 17
ENGLISH
INDEX
1. SPECIFICATIONS
1.1 Technical specifications
1.2 Breakdown of delivered components
1.3 Diagram of the appliance measurements
2. REQUIREMENTS PRIOR TO INSTALLATION
2.1 Floor
2.2 Flue liner
2.3 Type of appliance
2.4 Security insulation and distance
2.5 Air supply
2.6 Changes in the device
3. INSTALLATION
3.1 Installation process
4. USE AND OPERATION
4.1 Fuels authorized by the manufacturer
4.2 Pilot fire lighting
4.3 Combustion control
4.3.1 Primary register
4.3.2 Secondary register
4.4 Fire lighting
4.5 Load and reload
4.6 Door opening
4.7 Operation in adverse weather conditions
4.8 Fire Prevention
5. COOKING TIPS
5.1 Table of consumption and temperature
6. MAINTENANCE AND CLEANING
5.1 Maintenance
5.1.1 Locking mechanisms
5.1.2 Spare parts
5.2 Cleaning
5.2.1 Glass
5.2.2 Ash box
5.2.3 Flue liner
5.2.4 Painting
7. PROBLEMS: CAUSE AND SOLUTION
8. CE LABELLING
This manual consists of two documents, document I: USER'S GUIDE ON SPECIFICATIONS, INSTALLATION AND
OPERATION
and document II: ANNEX.
,
herein.
CAUTION:
ANNEXED document contains all the diagrams and pictures referenced
The
IT IS VERY IMPORTANT TO READ AND FOLLOW THESE USERS' MANUAL
INSTRUCTIONS PRIOR TO INSTALLATION AND USE OF THE EQUIPMENT.
pag. 9

Publicité

Table des Matières
loading

Table des Matières