Assembly And Adjustments - Shindaiwa HomePro 195 Série Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Assembly and Adjustments

Handle
1. The handle is attached to the outer
tube at the factory and positioned
vertically. See Figure 5.
2. Loosen the 4 screws on the handle
and rotate the handle 90 degrees. See
Figure 5.
3. Position the handle forward of the
Handle Positioning Label at the best
position for operator comfort (usually
about 10 inches ahead of the throttle
housing).
4. Secure the handle by alternately
tightening the four screws in a diago-
nal or "crisscross" fashion.
Assembly and Adjustments
Adjust Throttle Lever Free Play
The throttle lever free play should be
approximately 7 mm. Make sure that the
throttle lever operates smoothly with-
out binding. If it becomes necessary to
adjust the lever's free play, refer to the
illustration and proceed as follows:
1. Loosen the cable jam nuts to free the
cable from the support.
2. Adjust the jam nuts until the throttle
lever has approximately 7 mm of
free play.
3. Tighten the jam nuts to secure the
cable assembly to the support.
Assembly and Adjustments
F195s Cutting Attachment Shield Installation
1. Install the shield and clamp as shown
in figure 7.
2. Align the hole in the outer tube with
the locator on the cap; install the tow
(2) screws finger tight.
3. Tighten the screws alternately to
secure the cutting attachment shield
in place.
6
Handle
Figure 5
7 mm
22010A
Throttle Lever
Throttle Lever Free Play
Figure 6
F195s
Attachment
Outer Tube
Cap
Locating Hole
Screws
Figure 7
Handle Positioning Label
Outer Tube
Screws
Jam Nuts
Screw
Cutting
WARNING!
Shield
NEVER operate the F195s with-
out the cutting attachment shield
installed and tightly secured!

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Homepro t195sHomepro f195s

Table des Matières