gb | 6. Preparations for mounting
Condensation is drained to the outside
via the drip edge of the external cover or
soffit duct by tilting the wall insulation
sleeve. This prevents condensation from
running down the building wall.
The use of multiple ventilation units per
room is recommended for larger living
units.

5.4 Technical data

PP 60 KA air volume
PP 60 KL air volume
Level of heat recovery
Power consumption:
Level 1
Level 2
Level 3
Level 4
Level 5
Sound pressure level,
distance 1 m, free-
field conditions
Min. wall thickness
Max. wall thickness
Min. hole diameter
Ventilation unit diameter
Weight
The unit version is stated on the rating
plate.
For dimensions and characteristic curves,
see catalogue and/or website
(maico-ventilatoren.com)
 
30
17 - 50 m³/h
17 - 46 m³/h
> 80 %
2.0 W
2.4 W
2.9 W
3.7 W
4.8 W
18 - 35 dB(A)
270 mm
500 mm
220 mm
200 mm
5.3 - 5.8 kg

6. Preparations for mounting

6.1 Requirements at the installation
site
Installation is only permitted:
at an ambient temperature from
-15 ...+40°C.
on an external wall with sufficient load
bearing capacity.
with 1° to 2° incline in the direction of
the external wall.
with max. cable lengths of 20 m
between room air control and ventilation
unit.
6.2 Mounting sequence
During the building phase:
Install wall insulation sleeve [Chap. 7.2]
Fit recess-mounted double socket for
room air control [Chap. 7.3].
Fit soffit element if PushPull 60 KL-SR is
being used [Chap. 7.4].
Route empty tubes for J-YSTY cables,
0.8 mm, 4 wires from room air control to
ventilation units. One cable is needed
per ventilation unit. For position of cable
feedthrough, see next page.
Once the external plastering is
complete:
Fit external cover if PushPull 60 KA-SR
is being used [Chap. 7.5].
Once internal plastering and painting is
complete:
Install frame of internal cover and PP 60
K-SE ventilation unit [Chap. 7.6 and 7.7]
Fit RLS PP-K room air control and
connect [Chap. 8].