Wiring Diagram For Zone System; Plumbing Connections - Cola TERMO-PERLA Manuel D'installation, D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

2.7 Wiring diagram

2.8 Wiring diagram for zone system

Before installing the heating stove in the house, check the type of heating system;
in case of several zones, a special electronic controller for multi-zone circuits, available as an optional, must be
installed. This is to prevent overheating of the heating chamber due to possible simultaneous closing of the zone
valves and consequent stopping of hot water flow.

2.9 Plumbing connections

The heating capacity of the unit must be previously established by calculating the building's heat requirement
according to current regulations. The system must be provided with all the components for correct and regular
operation; in fact according to the rules of proper workmanship in installation, shutoff valves and non-return valves
allowing the stove to be isolated in case of maintenance and/or checks, must be interposed between the stove and
the heating system.Proceed slowly during heating chamber water filling, to allow correct and complete evacuation of
the air from the vent.
The pellet stove has an internal heating water circuit complete with circulating pump, safety valve, air vent,
temperature probes and pressure transducer.
If the heating system is managed in zones a multi-zone controller, available on request, must be installed.
38
TERMO-PERLA

Publicité

Table des Matières
loading

Table des Matières