Conti CC100 Notice Technique page 40

Masquer les pouces Voir aussi pour CC100:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

24.3.
PROGRAMMING THE FILLING UP THE BOILER WITH THE PUMP
If the machine is connected to a water network, it is not necessary to use the pump for filling the
boiler (minimum inlet pressure 0.15 MPa).
If the machine is connected to a water tank, to fill the boiler you have to activate the pump.
The machine is configured by default "without pump" to fill the boiler.
If the technician wants to use the pump to fill the boiler, it must proceed as follows:
 Settings of the machine to use the pump to fill up the boiler:
Turn off the machine.
Keep pressing the keys "P1 Gr1" + "P4 Gr1" and turn on the machine.
When the LEDs "L1 Gr1" + "L4 Gr1" light, turn off the machine again.
Wait a few seconds then turn on the machine.
If the technician wants to eliminate the use of the pump when filling boiler, you must proceed as
follows:
 Settings of the machine to suppress the pump to fill up the boiler
Turn off the machine.
Keep pressing the keys "P2 Gr1" +"P4 Gr1" and turn on the machine.
When the LED "L2 Gr1" + "L4 Gr1" light, turn off the machine again.
Wait a few seconds and then turn on the machine.
24.4.
SUMMARY OF PROGRAMMABLE FUNCTIONS
P1 Gr1
P2 Gr1
P1 Gr1
P2 Gr1
P1 Gr1
SACOME, CONFIDENTIAL Document,
P3 Gr1
P4 Gr1
P4 Gr1
P4 Gr1
P3 Gr1
Edition 07/2018 - CC100
TECHNICAL DOCUMENTS - page 39
it is forbidden to duplicate or communicate this document without previous authorization.
pre_brewing active
pre_brewing disabled
P5 Gr1
temperature setting
filling up with pump
filling up without pump
P5 Gr1
resetting data

Hide quick links:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cc101 iCc102 iCc103 iCc103 i tri

Table des Matières