Maintenance

The transfer switch is designed to be maintenance free under
normal usage. However, inspection and maintenance checks
should be made on a regular basis. Maintenance will consist
mainly of keeping the transfer switch clean.
WARNING Transfer switch contains hazardous voltage
that could cause electrocution resulting in death or
serious injury.
Despite the safe design of the transfer switch, operating
this equipment imprudently, neglecting its maintenance or
being careless could cause possible injury or death.
DO NOT work on equipment without removing 15 amp
fuse in generator and placing generator switch in
OFF position.
To reduce risk of electrical shock or personal injury,
disconnect all sources of supply voltage before servicing.
Visual inspections should be done at least once a month.
Access to transfer switch must not be obstructed. Keep
3 feet (92 cm) clearance around transfer switch. Check
for an accumulation of dirt, moisture and/or corrosion
on and around the enclosure, loose parts/hardware,
cracks and/or discoloration to insulation, and damaged or
discolored components.
Exercise the transfer switch at least once every three months
as described in Testing the Automatic Transfer Switch unless
12
a power outage occurs and home generator system has
gone through an automatic sequence. Allow generator to run
for at least 30 minutes.
Contact a licensed electrical professional to inspect and
clean the inside of the enclosure and other components of
your home generator system at least once a year.
When Calling for Assistance
You must have the Model Number and Serial Number from
the unit ID label at hand if it is necessary to contact a local
service center regarding service or repair of this unit. Obtain
this information from the unit ID label located on or inside
the enclosure.
To contact Briggs & Stratton call 800-743-4115, between
8:00 AM and 5:00 PM CT.
Installation Inspection
Before placing the system into service, inspect the entire
installation carefully.
Complete the "Installation Checklist" supplied with the
generator as you make the inspection. Ensure all items have
been filled-in and all signatures have been obtained. Instruct
the owner to mail the white copy to the address shown on
the checklist.
BRIGGSandSTRATTON.COM