Transportation And Installation; Transportation; Installation; Site Of Installation - Hettich InnoFit 400 Instructions De Service Et De Montage

Dispositif de montage des tiroirs
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. Transportation and installation

The machine must only be transported and installed by compa-
nies / persons instructed / authorised to do so by the manufactu-
rer or under the manufacturer's supervision.
During installation
mechanical work must be done by suitable, skilled persons.

5.1 Transportation

Note
To prepare transportation, please bear in mind
i
the weight of the machine!
The machine weighs approx. 640 kg.
Transportation via fork lift truck or pallet jack:
If fork lift trucks or hand pallet jacks are used for loading or
unloading, they must be in proper working order and suitable for
carrying the weights that are involved.
Attention must always be paid to the centre of gravity of the
item being moved!
During transportation, the machines must be properly secured;
the load must be evenly distributed. Avoid jerky movements.
Warning
Warning of suspended loads!
To relocate the machines they must be lifted and
transported. The machine can topple over and
fall as a result of improper lifting and transpor-
tation.
Never stand under suspended loads!
Warning
While transporting the machine, no persons must
be present on the machine or hang on it.
16

5.2 Installation

5.2.1 Site of installation

An even standing surface with a sufficient load bearing capa-
city is essential for setting up the machine in a proper and safe
manner. Any unevenness in the standing surface must be evened
out by metal shims to ensure that the machine is not standing in
a distorted manner.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

9037559

Table des Matières