Télécharger Imprimer la page

SRAM QUARG Mode D'emploi page 10

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 49
C A B L E G U I D E M O U N T I N S T A L L A T I O N
The  Cable  Guide  Mount  should  only  be  used  when  the  cable  guide  is  fastened  with  a  screw.  If  the  cable  
guide  is  fastened  with  a  rivet,  use  the  Bottom  Bracket  Cup  Mount  or  Adhesive  Putty  instead.  
Installation  Notes:  Do  not  allow  the  magnet  to  contact  the  power  meter.  When  properly  installed,  the  
magnet  should  be  in  line  with  the  cadence  sensors  and  within  2-­8  mm  (1/16"-­3/8")  of  the  sensors.
1.  
2.   Loosen  the  cable  guide  screw.  It  may  be  helpful  to  shift  the  front  derailleur  to  the  small  chainring  
position,  and  the  rear  derailleur  to  the  smallest  cog.  This  will  reduce  the  cable  tension,  and  make  it  
easier  to  slide  the  cable  guide  mount  under  the  cable  guide.
3.   Slide  the  mount  under  the  cable  guide.
4.   Reinstall  the  cranks.
5.   Tighten  the  cable  guide  screw.
6.  
8
CABLE GUIDE MOUNT INSTALLATION
2-8 mm
(1/16"-3/8")

Publicité

loading