CS
27.1
28
Start-up
29
Maintenance
85
Fuses
The fuses which are mounted on the disconnecting switch are: 20 A for STD and HGD series. See the electrical
scheme for 4kW resistances series.
Warning: Check that all power cables are correctly connected and all terminals are fastly fixed.
Warning: The voltage at the phase must be the one indicated on the unit label ± 5% tolerance. If this should not
happen, please, contact our factory.
Warning: before proceeding to start up, check that all the cover panel be located in the proper position and
locked with fastening screws.
Warning: Per l'arresto temporaneo (notte, week-end, ecc) mai interrompere l'alimentazione e seguire le
procedure illustrate al paragrafo relativo all'arresto della unità.
Warning: Before the first Start-up, the machine must be kept in STAND-BY position at-least for 5
hours.
Before to proceed to start up, close electrical line main switch (not supplied with the unit): the green led (line) will
be lit up.
All the units are provided with microprocessor control that manages all the various functions of the unit.
To start the unit, lower the humidity set under the humidity level of the enviroment.
Warning: Machine must be installed compelling with the norms and laws regarding plants.
Warning: All the operations describes in this chapter MUST BE DONE ONLY BY TRAINED STAFF.
Warning: Within the unit are present moving components. Any operation near the machine, even when the
electrical supply is disconnect, must be carried out with extremely carefull.
Warning: the head and the discharge pipe are high temperature parts. Pay extrem carefullness during works in
their proximity.
Warning: The alluminum fins are extremely sharp and can cause severe wounds. Pay extrem carefullness during
works in their proximity.
Warning: Before to start any maintanance activity on the machine, ensure that the electrical supply has been
disconnected.
Warning: Pay extrem carefullness during works in the proximity of the machine.
M.CS830-00 ITA-ENG 08/11/2021
ITA