Lifting and site handling

The lifting is obtained by using a forklift: fork must be inserted in the base pallet, and care must be taken in order
that the fork does not hit the section base or panel (see the picture below).
To unload the unit with a crane, pass bars under the machine and attach the necessary cable or chain lifting
devices to the bar, ensuring that they are clamped firmly; protect the sides of the chiller with boarding or material
of a similar nature.
Spacing bars
Protection
boarding

Unpacking

When unpacking the unit pay attention not to damage the unit.
The package is made up by different materials: wood, paper, nylon etc.
It's a good rule to keep them separately and deliver to the proper collecting centre in order to reduce their
environmental impact.

Positioning

It is necessary keep in account the following points in order to choose the most suitable place for the installation:
Arrange the machine with the purpouse of allow a adequate air flw(no narrow space);
Ensure the proximity to the electrical supply;
Guarantee the accessibility for the service, maintenance and reparation of the unit and its components;
Ensure that the floor can maintain the weight of the machine;
Ensure that the space could avoid any side effects due to the noise;
Maintenance;
Warning: This machine has been designed in order to be installad inside. Before to installed outside contact the
producer.
Warning: The installation place must be choose in order to avoid water flowing to the machine.
Warning: This machine can not be installed in laundry.