Start-Up - Grundfos DME 2 Notice D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. Start-up

Step
1
2
3
100%
4
5
6
100%
7
100%
8
If the pump is not operating satisfactorily, see section 9. Fault finding chart.
24
Action
Prior to start-up, the dosing head screws must be re-tightened:
• Cross-tighten the screws to 5.5 Nm (+ 0.5/– 0 Nm).
Connect the hoses/pipes:
• Connect the suction and dosing tubes/pipes to the pump.
• Connect a tube to the vent valve, if required, and lead the hose to
the tank.
Switch on the electricity supply:
• The display is on.
• The green indicator light is flashing (the pump has stopped).
• Select language, if required, see section 4.19.
Select the operating mode (see section 4.8):
• Manual.
• Pulse.
• Analog.
• Timer.
• Batch.
Connect the cables:
• Connect the control/level cables, if any, to the pump, see section
3.6.
Start the pump:
• Start the pump by pressing the on/off button.
• The green indicator light is permanently on.
Priming/venting:
• Press the
button on the pump control panel and let the pump
100%
run without a counter pressure. Loosen the vent valve by giving it a
1/8 to 1/4 turn, if required.
When the buttons
100%
priming, the pump can be set to run for a specific number of sec-
onds at maximum capacity.
Calibration:
• When the pump has been primed and is running at the right
counter pressure, calibrate the pump, see section 6.
and
are pressed simultaneously during

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dme 8Dme 12Dme 19Dme 48

Table des Matières