EN DSM 250S floor grinding machine

3 Operation

3 Operation
Risk of injury from parts flung out during
grinding!
Wear protective clothing and protective goggles!
Wear safety shoes!
Wear protective gloves!
Proceed with the greatest care and caution!
Danger of injury from loud noise during grinding
operation of the machine! Emission value is
greater than 85 dB (A).
Always wear hearing protection when the
machine is in operation!
High‐voltage electrical current can be fatal! Do
not run over, crush, or pull on the power cable!
Risk of injury from dust formation during grind­
ing work!
Connect an extractor unit to the machine or feed
in water during the grinding process.
Respiratory protection must be worn!
Risk of damage due to excessive extraction ca­
pacity!
The manufacturer strongly recommends to use
Use only Schwamborn extractors.
16

3.1 Starting up the machine

Observe the safety instructions in Chapter 2!
The initial start‐up of the machine may be car­
ried out only by qualified personnel!
A visual inspection of the machine needs to be
done before starting up the machine.
Particular attention should be paid to damaged
or loose components, wearing and filling levels.
Always use ETX diamond tools or abrasive bonding
for the surface to be machined (e.g. some surfaces
require wet grinding).
1.
Check the surface to be ground and remove any
protruding objects.
2.
Loosen the clamping screw [24, Fig. D], adjust
the guide bar [5, Fig. D] to the appropriate work
position and retighten the clamping screw.
3.
Check ETX diamond tools for function and con­
dition and replace if necessary
(! Chapter 4.2 – page 18).
4.
Place the grinding plate [30, Fig. F] with the in­
serted ETX diamond tools [31, Fig. F] on the
surface to be ground.
5.
Turn the carriage height adjustment [11, Fig. B]
until the machine is aligned horizontally
according to the built‐in water level [13, Fig. B].
6.
either:
Prepare for standard floor grinding
(! Fig. C/K/L/N)
a.
Push cover [19] onto the slide plate [35].
b.
Turn suction ring [18] until the cover
latches into the safety hood [17, Fig. K
left].
Or:
Prepare for edge grinding
(! Fig. B/C/K/L/N)
a.
Pull cover [19] from the slide plate [35] and
insert into the holder [25].
b.
Turn the suction ring [18] with the slide
plate [35] to the corresponding edge side
(right or left) (! Fig. M].
c.
Loosen the clamping screw [14] by hand.
d.
Swivel the drive all the way to the appropri­
ate side (right or left) or
forward(! Fig. M/N].
e.
Tighten clamping screw.
f.
Orient the slide plate [35] toward the wall
(! Fig. M/N aid lines).