Operation; Control Display - Grundfos ALPHA Notice D'installation Et De Fonctionnement

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.4.1 For line cord models
Follow procedure outlined in fig. 5.
Insert line cord plug onto pump
(side view):
To remove cord plug from pump
(bottom view):
1. Insert 1/8 in. flat blade
screwdriver into slot.
2. Rotate screwdriver.
3. Pull cord to remove.
Fig. 5
Connecting and removing power
plug for line cord models
5.4.2 Terminal box models
Wiring procedure:
1. Loosen terminal box screw from terminal box
cover.
2. Utilize either conduit port for wiring entrance.
3. Gently push open wiring terminal levers
(L-N-G) for wiring installation.
4. Slide terminal box cover over terminal box
body.
5. Tighten terminal box screw Phillips #1
(5 in-lbs).
6. Apply power.
7. Lights on the control panel indicate electrical
supply has been switched on.
Wiring terminal levers
Fig. 6
Terminal box wiring, 1 x 115 V
8
3
2
Green
White
Black

6. Operation

6.1 Control display

Fig. 7
Control display
Pos. Description
1
LED showing Watt or flow indicator
2
Production code:
• 1st and 2nd figures = year
• 3rd and 4th figures = week
3
LED indicating fixed speed
4
LED indicating constant pressure
5
LED AUTO
ADAPT
Push-button for selection of pump
6
setting

Publicité

Table des Matières
loading

Table des Matières