Pentair 6600 Manuel D'utilisation page 31

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 35
E
N
G
L
I
S
H
8.10
8.11
8.12
30
8 - ADVANCED PROGRAMMING MODE
6700 / 6765
DISPLAY FORMAT (U)
Press
the button. This display is identified by the letter "U". One of five following display
formats can be used. The current format used is the cubic meter (U4): the volume is in cubic
meter (m
), the flow rate in litre per minute (l/min), 24 hours timekeeping format, water hardness in French
3
degrees or °tH degrees and the sys-tem capacity in °tH degrees cubic meter (°tH x m
The format used for small volume is the litre (U2): the volume is in litre (l), the flow rate in litre per minute (l/
min), 24 hours timekeeping format, water hardness in French degrees or °Th degrees and the system capacity
in °tH degrees cubic meter (°tH x m3).
Ex.: - US format (not used)
- Litre format
- Standard metric (not used)
- Cubic meter format
Note: for further information, please contact our technical support.
VALVE TYPE (o)
Press the
button. This parameter is identified by the letter "o". This display is used to set the type of valve
used. The only possible settings are #1 and #2 for 6600 and 6700 valve family.
The red leds are used for 6700 / 6765, and NOT for 6600 / 6665.
Ex.: - 6600 / 6665
- 6700 / 6765
REGENERATION TYPE (7)
Press the
button. This display is identified by the number "7". This option is used to set the regeneration
type. There are several possible option settings:
- Timeclock: the electronics determines that regeneration is required when the set regeneration time has been
reached. The regeneration day override setting (see point 2.10) determines the number of days between two
regenerations.
- Meter
immediate:
the
when the available volume of softened water drops to zero. The regeneration begins immediately. [7 - - - - - 2]
- Meter delayed: the electronics determines that a regeneration is required when the available volume of
softened water drops to the reserve capacity. The regeneration begins immediately at the set regeneration
time only when the service flow has not been detected. With service flow, the regeneration will be delayed in
two 10 minute sections. After then if there is always a flow, the regeneration begins immediately. There will
be not a delay if the reserve capacity is zero.
electronics
determines
6600 – 6665 – 6700 – 6765
).
3
that
a
regeneration
[U - - - - - 1]
[U - - - - - 2]
[U - - - - - 3]
[U - - - - - 4]
[o - - - - - 1]
[o - - - - - 2]
[7 - - - - - 1]
is
required
[7 - - - - - 3]

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

666567006765

Table des Matières