Installation Instructions - Flush Installation
STEP 5 ANTI-TIP PROCEDURE (Cont.)
• Cut a 1" (2.54 cm) x 4" (10.16 cm)
block, 35" (88.9 cm) long.
• Measure and mark under the soffit,
5-1/4" (13.33 cm) from the front edge
of the cabinet.
• Secure the wood block to under the
soffit. From the bottom of the block to
the finished floor should measure 84"
(213.36 cm). See the illustration.
• The kit supplied with the unit contains
2 lag bolts and 4 toggles with bolts.
The wall bracket will be attached to the
wall in 4 places.
• Measure the opening where the unit is to be installed.
Mark the center with a vertical line.
• Measure up 82" (208.28 cm) from the floor. Mark this
point on the wall.
• Using a level, draw a horizontal line on the wall at this
height.
82"
To Floor
• Locate at least 2 studs on the back wall. Mark these
points on the horizontal line.
• Place the bottom of the wall bracket with tabs on the
horizontal line. Align the center notch on the bracket
with the center line on the wall.
Line on Wall
31-49142 Rev. 2
Center
The anti-tip wall bracket has a series of holes. Select 2
holes that match with the located studs. Make sure the
holes selected are on the center of the studs. Mark the
wall at these points.
• Mark an additional hole at each end of the bracket.
If one of the studs is closer to the end of the bracket,
mark an additional hole towards the center of the
bracket.
Two Additional
Hole Locations at
Ends of Brackets
• Drill 1/2" (1.27 cm) holes into the wall board at the
locations marked for the toggles to be mounted (not the
stud markings).
• Drill 3/16" (0.47 cm) holes into wooden studs where
marked. If steel stud construction, drill 1/2" (1.27 cm)
holes into the studs where marked. You will use 2
toggles with the metal studs.
Install Wall Toggles:
The wall toggles and bolts can be ordered as Service Kit
#WR49X10193. Wall toggles are installed in the drywall
and metal studs for stability. Install the wall toggles as
follows:
• Drill 1/2" (1.27 cm) holes at the wall markings made in
the holes at the ends of the wall bracket.
• Hold the metal
channel flat against
the plastic straps and
slide the channel
through the hole.
• Gently pull back at the
ends of the plastic straps to
make the channel rest flush
behind the wall.
• Hold the ends of the straps
in one hand and slide the
plastic cap along the straps
until the flange of the cap is
flush with the wall.
• Place your thumb between the
plastic straps and bend up and
down to snap the straps off at
the wall.
33
Wall Bracket
Center
Line On Wall
Wall Studs
Plastic Straps
Metal Channel
Cap