Unpacking
During unpacking, check that the components are in
good condition and tally with the number stated; in the
event of damage, report the damage to the retailer or
directly to the manufacturer within 8 days of receiving
Fitting the upper point of the three-point hitch
Carry out the operations described.
1) Position the upper three-point hitch (A).
2) Tighten the bolts (B).
3) Tighten the bolts on the opposite side.
4) Position the tie rod (C) as shown in the figure.
5) Tighten the bolt (D).
6) Tighten the bolt (E).
7) Repeat the same procedure to fit the other link pin.
Fitting the conveyor
Carry out the operations described.
1) Position the conveyor (A).
2) Tighten the nuts (B).
3) Repeat the same procedure to fit the other convey-
or.
English language
INFORMATION CONCERNING HANDLING AND INSTALLATION
the machine.
The packing materials must be appropriately disposed
of or recycled in accordance with the laws in force.
C
UN41-0740CP
A
UN41-0741CP
9
4
D
A
B
E
B