2. TRANSPORT AND INSTALLATION.

2.1. TRANSPORT AND PACKAGING.
Knocks and sudden movements must be avoided when transporting the equipment. In any case, the packaging
must be protected from water.
HANDLE THE EQUIPMENT CAREFULLY, IT WILL LAST LONGER !
2.2. ELECTRICAL SUPPLY INSTALLATION.
The Plasma Cutting Equipment location must satisfy the following requirements:
Place: Dry and ventilated, far enough away from the cutting area in order to prevent the metal dust caused by the
cutting process from getting into the equipment.
ELECTRICAL INSTALLATIONS SHOULD ONLY BE HANDLED BY SPECIALISED PERSONNEL.
2.3. PNEUMATICINSTALLATION.
Electrical installation. Electrical elements of the installation.
Protection system
Connection
Magnetother
mal switch
(Curve "D")
Differential
(Minimum)
DO NOT FORGET TO FIT THE EARTH CONNECTION INTO THE PLUG.
Power supply hose (RVK-1KV).
Length
15 m
15-50 m
On the rear front of the equipment is the air inlet for the pneumatic installation. A
semi-automatic discharge pneumatic filter is located at this inlet.
Recommended compressor for the installation: 4 CV - 480 l/min
Working pressure:
5.5 ÷ 6.0 bar (No-load- Airless)
5.0 ÷ 5.5 bar (For cutting with air flowing through the torch).
GALA CUT 700
Gala Cut
16A 3P + T
plug.
3P 15 A
circuit
3P 25A/300 mA
breaker.
GALA CUT 700
400-440 V
2.5 mm
2
4 mm
2
700
15