Télécharger Imprimer la page

ProMinent CONCEPTplus CNPa Mode D'emploi page 43

Publicité

Les langues disponibles

Les langues disponibles

Installing the hose line
Fig. 3
1.
Assemble the metering pump on a
storage tank or a bracket using screws
and U-washers (Ø 6 mm).
2.
Cut the pressure hose to the required
length.
3.
Pull the union nut (5) and clamping ring
(4) over the hose line (6).
4.
Push the shortened hose end up to the
stop over the nozzle (3).
5.
Press the hose (6) on and tighten the
union nut (5).
1
2
3
4
5
6
P_PNM_0008_SW
Assembly and Installation
6.
Install the suction line.
To do this, shorten the free end of
the suction line so that the foot
valve hangs just above the base of
the storage tank.
With feed chemicals with impurities
or sediment, shorten the free end of
the suction line so that the foot
valve hangs at least 50 mm above
the base of the storage tank.
Keep the suction line and the suc‐
tion height as short as possible.
Route the suction line with an
upwards slope.
7.
Install a foot valve.
43

Publicité

loading