Motor Mounting Instructions; Motor Mounting - BUSCH COBRA NC 0100 B Supplément Au Manuel D'installation Et De Maintenance

Pompe à vide
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Highest permissible
motor power for
COBRA
Frequency
direct network
connection
50 Hz
NC 0100 B
60 Hz
50 Hz
NC 0200 B
60 Hz
50 Hz
NC 0300 B
60 Hz

Motor mounting instructions

Before the mounting of the motor, the coupling must be installed bet-
ween the motor and the vacuum pump. Respect the Installation and
Operating Instructions of the coupling. Regarding the explosion pro-
tection, the coupling must show at least the same protection degree
like the vacuum pump for the outside category ("outside" (o)). See the
nameplate of the vacuum pump. Concerning the explosion group and
the temperature class, a higher protection degree can be applied. But
only Busch original couplings should be used.

Motor mounting

The motor is fixed to the center flange of the pump thank to 4 screws.
Highest permissible
motor power using a
frequency converter
3 kW
4 kW
4 kW
7,5 kW
5,5 kW
7,5 kW
7,5 kW
11 kW
7,5 kW
11 kW
9,2 kW
11 kW
Installation
Seite/ Page/ Page 17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cobra nc 0200 bCobra nc 0300 bCobra nt 0100 bCobra nt 0300 b

Table des Matières