Minimum Clearance To Combustibles; Minimum Enclosure Clearances - Napoleon NZ6000 Instructions D'installation Et D'utilisation

Table des Matières

Publicité

5.3

MINIMUM CLEARANCE TO COMBUSTIBLES

Framed Enclosure
Rear
Sides
Ceiling
(enclosure)
Ceiling
(in front of appliance)
Chimney
Hot air Gravity Ductwork Insulation
Solid Pack Chimney
Ceiling
(enclosure)
Air Cooled
Ceiling
(enclosure)
5.4

MINIMUM ENCLOSURE CLEARANCES

15" required
if coiling
liner
Shown with air intake liner coiled to create a cold trap.
OR
A minimum of 6" is required to combustibles from the
side of the unit. This is only if the intake liner is routed
below the 2" projection of the outer casing of the unit.
If the intake liner is routed vertically along the side of
the unit then a spacing of 7" is required.
6"
MIN
When framing in unit, allow for fi nishing material
thickness.
A minimum of 6" is required to combustibles from the
side of the unit. This is practical only if the intake liner
is routed below the 2" projection of the outer casing of
the unit. If the intake liner is routed vertically along the
side of the unit then a spacing of 7" is required.
- 0" to stand-offs (rear)
- 6" to sides*
- 120" from the base of the appliance (unless shielded with metal
studs and cement board)
- 84" from the base of the appliance
- 2" (follow manufacturers instructions)
- 1"
- 120" from the base of the appliance (unless shielded with metal
studs and cement board).
- 84" from the base of the appliance
50"
30
21"
50"
MIN
61
/
"
1
2
30
/
"
3
4
87"
/
"
3
4
23
A
1/2" Cement board
finishing
2 layers of 1/2" cement
board needed to fi ll gap A.
W415-0594 / E / 10.19.12