Télécharger Imprimer la page

Section 5 Maintenance - ESAB PT-35 Manuel D'instruction

Publicité

SECTION 5
MAINTENANCE
4. To install the new torch head assembly - Insert the new piece of heatshrink
tubing onto the pilot arc cable attached to the new torch head assembly. Connect
the pilot arc cable and the main power cable by reversing the steps taken to
disconnect them. Be sure to slide the heatshrink tubing completely over the knife-
splice connection. Apply heat to form the tubing to the connection, ensuring that
the connection is completely insulated. (Several layers of electrical tape can also
be used in place of heatshrink tubing if desired).
New Heatshrink Tubing
New Torch Head Assembly
5. Tape pilot arc cable connection back to main power cable.
Electrical Tape
6. Slide the handle forward and thread it firmly onto the torch body.
98

Publicité

loading

Ce manuel est également adapté pour:

0558004351055800435205580043530558004354