Rotary ARO14 Instructions D'installation page 14

Masquer les pouces Voir aussi pour ARO14:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

18. 3ø Control Box Installation:
A. Attach Mounting Bracket to the Power Unit Bracket
using (4) 5/16"-18NC x 1" Lg. Soc HD Flat C'Sink Screws,
(4) 5/16" Flat Washers, and (4) 5/16"-18NC Hex Flange
Nuts, Fig. 24a.
B. Attach Control Box to Bracket using (4) 1/4"-20NC x 1/2"
HHCS, (4) 1/4" Flat Washers, and (4) 1/4" Star Washers.
Fig. 24a.
C. Route cord through strain relief on motor and connect
per table on the bottom of page 13.
Note:
The contactor in the control box has a 480V coil.
For installations where the electric supply is 230V,
the coil must be replaced with the extra 230V coil
shipped with the control box. For 575V electric
supply, the coil must be replaced with the extra
575V coil shipped with the lift.
Fig. 24b
5/16"-18NC x 1" Lg.
Soc. HD Flat C'Sink Screw
1/4" Flat Washer
1/4" Star Washer
1/4"-20NC x 1/2" HHCS
5/16"-18NC Hex Flange Nut
Fig. 24a
14
5/16" Flat Washer

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Smo14

Table des Matières