Maintenance Schedule - IMER RD 75 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8. MAINTENANCE SCHEDULE

□ This maintenance schedule gives only guidelines. In case of heavy duty operation (dirty or dusty
environment), perform maintenance more often.
NOTE
○ This sign indicates that the user can perform the
● This sign indicates that a special tool is required to perform the task. Only qualified technicians
are authorised to perform these interventions. Contact a specialist.
Operation to perform
Control all the components listed in section «PRE
OPERATION CHECKS»
Check the tightening of bolts, screws and nuts
Check the oil level and top up if necessary
Replace the engine oil (following the 20 first
operating hours)
Check the air filter
Replace the air filter (following the 20 first
operating hours)
Control the fixing of the pump to the engine
Control the sealing of the connections
Drain the water, clean the filter and the tank of the
fuel cock
Replace the fuel filter
Replace the fuel pipes
Clean the carbon deposit from the cylinder head
and piston face
Control and adjust the valve clearance
Change the antivibratory mountings
Have the engine overhauled (if needed)
Check the check valves
Open the pump body and clean
Check the exhaust muffler
Change the oil filter (following the 20 first operating
hours)
Empty and clean the fuel tank
Check the engine speed (during the first use)
Check the engine compression
Check the fuel injection pump
Check the battery charge (12 V)
Check the level of the liquid in battery
WARNING
intervention.
8 h
50 h 200h 400h 500h 1000h 1500 h
(daily)
Operating hours
F
EN
E
R
43

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Swt 75dSwt 120dJet100d

Table des Matières