Installation
4.1.3
Rotators (optional)
When using rotators, a free-wheel throttle valve must be installed.
In order to prevent a sudden speedup and stopping the rotational movements, as this may damage the
device within a short time.
4.2
Hydraulical connection
4.2.1
Installation on carrier/lifting equipment
•
The hydraulic installation is carried out according to the enclosed hydraulic circuit diagram.
•
The connection to the carrier/lifting equipment may be accomplished only by qualified personnel.
•
Connection the device to the energy supply system be sure that the environment is free of dirt and that
the connecting hoses are free of abrasion and don not stuck in outstanding parts, while moving.
56400002
Open
gripper
Connection 12L
14 / 20
Close
gripper
GB