Commissioning; Installation Note; Power Supply - Soehnle Professional 7845 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9.

Commissioning

9.1 Installation note

Before connection, make sure that the required voltage supply according to the type plate corresponds
to the local conditions. Protect the unit from shocks, vibrations, strong heat or cold, draughts, chemicals
and moisture by selecting a suitable location.
A warm-up period of 30 minutes after switching on stabilises the measured values.
Place the scale on a firm, free and horizontal surface.
f
Make sure that no cables or other objects are trapped under the scale.
f
Align the scale by turning the foot screws.
f
For installation sites in Germany this is fulfilled if the floors comply with the tolerance specifications
for ready-to-use floors according to DIN 18202, table 3 line 4. For other countries, the respective
applicable national standards can be used as a basis.

9.2 Power supply

Power is supplied by 6x AA batteries LR6 as standard or by the optionally available mains adapter with
mains plug (art. no. 2563.45.007).
Type AA batteries can be used.
To obtain a correct charge status display, the option Battery must be activated in UCAL.
See separate description User mode 7835, art. no. 470.702.124.
If required, this document can be requested from Soehnle Industrial Solutions or from your local scale
dealer.
46

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

7835.01.0017835.01.0027835.02.0017835.02.002

Table des Matières