Installing Gas Supply - Miller Spoolmatic 15A Manuel Du Propriétaire

Masquer les pouces Voir aussi pour Spoolmatic 15A:
Table des Matières

Publicité

4-7. Installing Gas Supply

6
5
4
Tools Needed:
1-1/8, 5/8 in
Argon Gas
OR
7
8
CO
Obtain gas cylinder and chain to
running gear, wall, or other station-
ary support so cylinder cannot fall
and break off valve.
1
Cap
2
Cylinder Valve
Remove cap, stand to side of valve,
and open valve slightly. Gas flow
blows dust and dirt from valve.
Close valve.
3
Cylinder
4
Regulator/Flowmeter
Install so face is vertical.
1
5
Gas Hose Connection
Fitting has
threads.
6
Flow Adjust
Typical flow rate is 20 cfh (cubic feet
2
per hour). Check wire manufactur-
er's recommended flow rate.
Make sure flow adjust is closed
when opening cylinder to avoid
damage to the flowmeter.
7
CO
8
O-Ring
3
Install adapter with O-ring between
regulator/flowmeter
cylinder.
1
2
3
Gas
2
5/8-18
right-hand
Adapter
2
and
CO
2
ssb3.1* 5/94 − 158 697-A
OM-1213 Page 13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Spoolmatic 30a

Table des Matières