2-2. Connecting Work Clamp And Gas/Air Supply
2
6
From Gas/Air Supply
Tools Needed:
5/8, 1-1/8 in
OM-2210 Page 8
1
3
4
5
1
Work Clamp
2
Workpiece
Connect work clamp to a clean,
paint-free location on workpiece, as
close to cutting area as possible.
.
Use only clean, dry air with 70
to 150 psi (483 to 1034 kPa)
pressure.
3
Air Filter/Regulator
4
Gas/Air Inlet Opening
5
Hose
6
Teflon Tape
Obtain hose with 1/4 NPT right-
hand thread fitting. Wrap threads
with teflon tape (optional) or apply
pipe sealant, and install fitting in
opening. Route hose to gas/air
supply.
Adjust gas/air pressure according
to Section 3-1.
Ref. ST-091 547-C / Ref. ST-801 306-B