Operation; Before Attempting To Start The Engine - Suzuki DF4 Manuel Du Propriétaire

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. For the next 1 hour:
Safe boating conditions permitting, operate
the engine in gear at 4000 r/min. or at three-
quarter throttle. Avoid running the engine at
full throttle.
3. Remaining 7 hours:
Safe boating conditions permitting, operate
the engine in gear at desired engine speed.
You may occasionally use full throttle; how-
ever do not operate the engine continuously
at full throttle for more than 5 minutes at any
time.
NOTICE
Running continuously at full throttle for
more than 5 minutes at a time during the
last 7 hours of break-in operation may
cause severe engine damage such as sei-
zure.
During the last 7 hours of break-in opera-
tion, do not operate at wide open throttle
for more than 5 minutes at a time.

OPERATION

BEFORE ATTEMPTING TO START THE
ENGINE
Using BUILT-IN FUEL TANK
1. The motor has been lowered into the water.
2. Turn the air-vent screw on top of the fuel
tank cap fully counterclockwise to open the
vent.
3. Turn the fuel cock lever to left.
NOTE:
When turning the fuel cock lever to left, fuel flow
from the built-in tank.
23

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Df6

Table des Matières