Installation - Bodet MICROQUARTZ 6 Instructions De Mise En Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

· Select a location with minimal
temperature variations and far from
any electrical interference source
(relays, motors...)
· Fix the Microquartz on the wall,
cover removed.
· Run all cables through the
opening located below the
transformer.
WARNING : The cable should not
run behind the printed circuit board.
Connections :
· Connect live (phase), and earth (ground) on terminal 19.
· Connect the slave clock line (s) according to the type of impulse selected (see master
clock set up chapter).
Note : for 1/2 min SERIES impulses add an adjustable resistor on output 18 to regulate
intensity.
· Connect the programming channels on terminal 15 (terminal 4 to 6 may be already used
for slave clock impulses).
If the equipment is intended for operation with :
- Radio antenna : connect the antenna on terminal 24 taking care of setting the cable shield
into the clamp to ensure good earthing.
- Min or 1/2 min reception : connect the impulse line on terminal 25 in A and C.
· Connect the terminal + of the battery.
The display shows :
(if display is incorrect press RESET).
· Switch on the mains : the green LED 17 lights up.
Radio antenna connection : Europe only
Microquartz 6 can be synchronized by means of either AD 10 antenna for DCF 77 signal or
FI antenna for FRANCE INTER signal.
- Select the antenna location as follows :
· As high as possible
· Far from any metallic structure or armoured concrete
· Far from eventual electric interference sources
· Protected from lightning.
Front view
Hole for cables
15

Publicité

Table des Matières
loading

Table des Matières