78 | Installation
Bosch BPT-S 3 / 3.68 / 4 / 4.6 | Operating manual
■
Solar generator cable is connected.
5.1.5
Dismantling the plug
Materials required
Slotted screwdriver
Prerequisites
Service switch to position 0
If an external DC circuit breaker is included in the
installation: DC circuit breaker to position 0
If the wire strand can no longer be seen once the
spring has been pressed down in the terminal area,
the cable is not positioned correctly. In this case
dismantle the plug and re-terminate the cable.
▶
Procedure
1. Loosen the plug/socket with the slotted
screwdriver (do not open plug/socket)
English
Bosch Power Tec GmbH