Installation Requirements; Tools And Parts - KitchenAid KSDB900E Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Tools and Parts

Gather the required tools and parts before starting installation.
Read and follow the instructions provided with any tools listed
here.
Tools Needed
Tape measure
P hillips
screwdriver
Flat-blade
screwdriver
¹⁄
" (3 mm) flat-
8
blade screwdriver
Level
Drill
Adjustable wrench
Slip joint pliers
Pipe wrench
" (2.4 cm)
15
16
combination
wrench
¹⁄
" (3.2 mm) drill
8
bit (for wood
floors)
Marker or pencil
Parts Supplied
Check that all parts are included.
LP/Natural gas conversion kit
Blower mounting/venting template
Grease filter (packaged in place)
Oven racks (3)
Blower motor kit
– Blower motor (under unit)
– Kit (packed in cavity)
Inlet duct assembly
10-32 hex nuts (attached to terminal block) (3)
Direct wire lugs (3)
#12 x 1
" (4.1 cm) screws (for mounting anti-tip bracket) (2)
5
8
Anti-tip bracket (inside oven cavity)
Anti-tip bracket must be securely mounted to the back wall
or floor. Thickness of flooring may require longer screws
to anchor bracket to subfloor. Longer screws are available
from your local hardware store.
4

INSTALLATION REQUIREMENTS

5 ¹⁄
" hole saw (round ducting)
2
S aw for 3¹⁄
" x 10" rectangle
4
vent
#2 square bit and driver
Flashlight
Masking tape
Pipe-joint compound resistant
to natural and LP gases
" (4.8 mm) carbide-tipped
3
16
masonry drill bit (for concrete/
ceramic floors)
Noncorrosive leak-detection
solution
For LP/Natural Gas Conversions
½" (13 mm) combination
wrench
¼" (6 mm) nut driver
" (7 mm) nut driver
9
32
Parts Needed
If using a power supply cord kit:
A UL listed power supply cord kit marked for use with
ranges. The cord should be rated at 250 volts minimum,
40 amps or 50 amps that is marked for use with nominal
1³⁄
" (3.5 cm) diameter connection opening and must
8
end in ring terminals or open-end spade terminals with
upturned ends.
A UL listed strain relief.
U se an approved vent cap for proper performance. If an
alternate wall or roof cap is used, be certain the cap size
is not reduced and that it has a backdraft damper.
A fter determining your vent installation, one of the following
is needed:
Jenn-Air
5" (12.7 cm) Round surface wall cap damper –
®
Order Part Number A405.
Jenn-Air
6" (15.2 cm) Round surface wall cap damper –
®
Order Part Number A406.
NOTE: If using 6" (15.2 cm) round venting, you will need a
5" (12.7 cm) to 6" (15.2 cm) round vent transition.
Jenn-Air
3¼" x 10" (8.3 x 25.4 cm) Surface wall cap
®
damper – Order Part Number A403.
To order, see the "Assistance or Service" section of the Use and
Care Guide:
– Metal ducting
– Vent clamp
– Aluminum foil tape
Check local codes and consult gas supplier. Check existing
gas supply and electrical supply. See the appropriate "Electrical
Requirements" and "Gas Supply Requirements" sections.
It is recommended that all electrical connections be made by
a licensed, qualified electrical installer.
Optional Parts
To purchase these or any other accessories, please reference
the "Accessories" section of the Use and Care Guide for
contact information.
S ide Trim Kits:
" (1.7 cm) White – Order Part Number W10675027
5
8
" (1.7 cm) Black – Order Part Number W10675026
5
8
" (1.7 cm) Stainless Steel – Order Part Number
5
8
1¹⁄
" (2.9 cm) White – Order Part Number W10731885
8
1¹⁄
" (2.9 cm) Black – Order Part Number W10731886
8
1¹⁄
" (2.9 cm) Stainless Steel – Order Part Number
8
B acksplash Kits:
High 6" (15.2 cm) White – Order Part Number W10655448
High 6" (15.2 cm) Black – Order Part Number W10655449
High 6" (15.2 cm) Stainless Steel – Order Part Number
W10655450
W10675028
W10731887

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kseg950ess

Table des Matières