Chattanooga Fluidotherapy FLU110D Mode D'emploi page 33

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PREVENTIVE MAINTENANCE
Fluidotherapy® - Dry Heat Therapy
WEEKLY MAINTENANCE (CONTINUED)
From the outside of the unit, reach through
the sleeve and install the outer sleeve
retaining ring.
NOTE:
Start installation of the outer ring at the top
of the unit. As the ring is being seated, pull
the area of the sleeve tight. This will aid in the
prevention of excessive medium spillage and
patient comfort.
29 29

Publicité

Table des Matières
loading

Table des Matières